AUTHENTIC PHOTOS FROM COMPLETED WORK

Selected underwater and hydrotechnical work

These examples show verified work completed by Aqua Weld. Every new project is assessed separately according to the structure, site access and conditions.

UNDERWATER CUTTING

Cutting a sheet pile section below the waterline

The work involved torch cutting a section of steel sheet pile under water and removing the cut element. The photograph shows the steel section being lifted above the water.

Torch-cut sheet pile section being lifted from the water
The cut sheet pile section after underwater torch work.

HYDROTECHNICAL WORK

Preparing a wastewater treatment chamber for concreting

The completed scope included cleaning the sheet piles, removing silt from the chamber floor, welding steel closure plates and concreting. The photographs show the chamber during preparation and a closure plate installed before concrete placement.

Call: +48 515 975 545